Home Forums General General Board Skandi Arctic

Skandi Arctic

Home Forums General General Board Skandi Arctic

Viewing 8 posts - 1 through 8 (of 8 total)
  • Author
    Posts
  • #2696
    Ullevi
    Participant

    Technip’s new DSV.

    Anyone know where it is and what it’s doing at the moment?

    Many thanks.

    #24039
    Steve
    Participant

    lEFT Maloy Norway last week

    #24040
    grassyscones
    Participant

    In Invergordon so ive been informed.. You could give AIS a shout

    #24041
    gary Brindle
    Participant

    I flew over Skandi Artic berthed at Invergordon yesterday 11th ,lots of space cleared on the deck, supports being placed for something to be lowered into place. This press release explains what is in progress..

    Technip Norway has been awarded by ConocoPhillips Skandinavia AS a lump sum contract for the Ekofisk VA subsea water injection project located in block 2/4 on the Norwegian Continental Shelf.
    This contract provides for the installation, tie-in and commissioning of subsea facilities between the existing Ekofisk facilities and a new eight well subsea injection template (2/4VA).
    The detailed design and the other equipment will be provided by ConocoPhillips. Offshore installation is scheduled for 2009.
    Installation will be performed by several vessels including Technip’s new-built diving support vessel, the Skandi Arctic.

    #24042
    grassyscones
    Participant

    I flew over Skandi Artic berthed at Invergordon yesterday 11th ,lots of space cleared on the deck, supports being placed for something to be lowered into place. This press release explains what is in progress..

    Technip Norway has been awarded by ConocoPhillips Skandinavia AS a lump sum contract for the Ekofisk VA subsea water injection project located in block 2/4 on the Norwegian Continental Shelf.
    This contract provides for the installation, tie-in and commissioning of subsea facilities between the existing Ekofisk facilities and a new eight well subsea injection template (2/4VA).
    The detailed design and the other equipment will be provided by ConocoPhillips. Offshore installation is scheduled for 2009.
    Installation will be performed by several vessels including Technip’s new-built diving support vessel, the Skandi Arctic.

    TBH that deck would take alot of filling is a beast of a vessel. 2 x Triton XLS and a Seaeye Lynx to be mobbed onto it.

    #24043
    gary Brindle
    Participant

    There are twelve trestles in place on the deck.

    skandi_artic_invergordon_july11_2009_30_402.jpg
     Description: Skandi Artic Invergordon 11 Jul 09
    skandi_artic_invergordon_july11_2009_30_402.jpg

    #24044
    Ullevi
    Participant

    Many thanks everyone!

    Hopefully get on it soon 🙂

    #24045
    GraemeRSU
    Participant

    It’s actually

    2 off – Triton XLX’s which are hanger based and already installed – LARS is a Sepro Gantry and RappHydema Electric Heave Compensated Winch
    2 off – Moonpool Dive Bell systems again built into the vessel (currently being integrated)
    1 off – Lynx Obs ROV – Not yet installed

Viewing 8 posts - 1 through 8 (of 8 total)
  • You must be logged in to reply to this topic.

Comments are closed.

Skip to toolbar