Home Forums General General Board Dam and rock tunnel inspections

Dam and rock tunnel inspections

Home Forums General General Board Dam and rock tunnel inspections

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #4458

    Hello:

    Im interested in hydropower dam and flooded tunnels inspections..does anyone know to deal with positioning in this environment (tunnels specially).

    Are there any papers addresing the subject?.

    Thanks very much in advance

    #31366
    Bill Bulloch
    Participant

    Hi,
    Are you interested in performing tunnel inspections or as a client?
    There are ways of accurately positioning a vehilce within a tunnel, however, the most common way is by means of an umbilical line-counter.
    We have experience in tunnel penetrations up to, so far, 2.6km for video and profiler surveys using a specifically modified ROV.
    Let me know if you need any further info.

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.

Comments are closed.

Skip to toolbar