View the full case study, product information and reviews on Geo-matching.com
"The planned widening of the Maas creates a landscape correction that prevents future
flooding. Gravel barriers are prepared so that the river can buffer any additional flow.
Hydrography is imperative in this region. The river will be at its widest point at the town of Itteren."
http://www.geo-matching.com/upload/463-2821-6193.pdf
http://www.geo-matching.com/products/case-studies/id2821-pythagoras-cad.html