Crane Operator required for the Resolution during a wind farm installation. Semi permanent position on a 4 week on 4 week off rota. Mobilise in Belfast 21.12.07. Experience of 300 ton Kenz would be beneficial.
ENG 1 and Personal Survival certificates as a minimum + Sparrows stage 2 crane operator certificate.